Building SF
526,001 SF
Total Site Area
38.29 Acres
Clear Height
40’ clear
Column Spacing
54’-0” x 50’-0”
54’-0” x 70’-0” speed bay
Auto Parking
313 spaces | 0 future spaces | 313 Total
Trailer Parking
124 spaces | 212 future spaces | 336 Total
Exterior Walls
Reinforced Tilt-up Concrete Wall
Panels with Textured Painted Finish
Structural Steel
12 x 12 Columns / Steel Bar Joists / White Roof Deck
Slab Construction
7” Unreinforced | 4,000 PSI
Vapor Barrier
10,000 SF of 15 Mil Vapor Barrier
Under the Slab at Potential Office Areas
Dock Doors
52 Built | 52 Future | 104 Total
Drive-In Doors
4
Roofing
45 Mil White TPO with R-30 Insulation
HVAC
Make-Up Air Units to Maintain 55 Degrees Minimum
Fire Protection
ESFR
Electrical Service
4000 Amps 480/277V
Lighting
LED, 30 F.C.
Office
Build to Suit
Building SF
468,064 SF
Total Site Area
40.78 Acres
Clear Height
40’ clear
Column Spacing
54’-0” x 50’-0”
54’-0” x 70’-0” speed bay
Auto Parking
290 spaces | 0 future spaces | 290 Total
Trailer Parking
115 spaces | 249 future spaces | 364 Total
Exterior Walls
Reinforced Tilt-up Concrete Wall
Panels with Textured Painted Finish
Structural Steel
12 x 12 Columns / Steel Bar Joists / White Roof Deck
Slab Construction
7” Unreinforced | 4,000 PSI
Vapor Barrier
10,000 SF of 15 Mil Vapor Barrier
Under the Slab at Potential Office Areas
Dock Doors
47 Built | 45 Future | 92 Total
Drive-In Doors
4
Roofing
45 Mil White TPO with R-30 Insulation
HVAC
Make-Up Air Units to Maintain 55 Degrees Minimum
Fire Protection
ESFR
Electrical Service
4000 Amps 480/277V
Lighting
LED, 30 F.C.
Office
Build to Suit
Building SF
200,880 SF
Total Site Area
14.08 Acres
Clear Height
36’ clear
Column Spacing
54’-0” x 50’-0”
54’-0” x 60’-0” speed bay
Auto Parking
108 spaces | 0 future spaces | 108 Total
Trailer Parking
33 spaces | 64 future spaces | 97 Total
Exterior Walls
Reinforced Tilt-up Concrete Wall
Panels with Textured Painted Finish
Structural Steel
12 x 12 Columns / Steel Bar Joists / White Roof Deck
Slab Construction
7” Unreinforced | 4,000 PSI
Vapor Barrier
15 Mil Vapor Barrier
Under the Slab at Entire Front Bay
Dock Doors
20 Built | 20 Future | 40 Total
Drive-In Doors
Roofing
45 Mil White TPO with R-30 Insulation
HVAC
Make-Up Air Units to Maintain 55 Degrees Minimum
Fire Protection
ESFR
Electrical Service
2000 Amps 480/277V
Lighting
LED, 30 F.C.
Office
Build to Suit
INDUSTRIAL SITE CONTACT
GEORGE STEVENS, SIOR, CCIM
First Vice President
+1 216 363 6438
george.stevens@cbre.com
RETAIL PAD SITE CONTACT
VINCE MINGO
Associate
+1 216 535 0188
vince.mingo@cbre.com
Interested in viewing other properties? Visit CBRE’s Global Listings to explore additional availabilities
©2023 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. You should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. All other marks displayed on this document are the property of their respective owners, and the use of such logos does not imply any affiliation with or endorsement of CBRE. Photos herein are the property of their respective owners. Use of these images without the express written consent of the owner is prohibited.